Powered by

-PURE ENERGY MINERALS COMMENCES NEXT PHASE OF DRILLING AND REPORTS BRINE CHEMISTRY FOR MINI-PILOT PROCESS TESTING

Apr 18, 2016 - ENP Newswire

VANCOUVER, BC - Pure Energy Minerals Limited (TSX VENTURE: PE) (FRANKFURT: A111EG) (OTCQB: HMGLF) announces that a core drill is once again turning at its Clayton Valley South Lithium Brine Project, located near Silver Peak, Nevada.

Based on their successful track record during the phase 2 drill program at CVS, Harris Exploration Drilling and Associates Inc. remains the primary drill contractor on the Project. The drillers collared the new well (CV-3) approximately 200 metres (660 ft) sout...