Powered by

-Osisko Metals Intersects 10.49% Zinc+Lead Over 22.84 Metres and 12.15% Zinc+Lead Over 17.00 Metres at Pine Point

Nov 20, 2018 - ENP Newswire

MONTREAL - Osisko Metals Incorporated (the 'Company' or 'Osisko Metals') (TSX-V: OM; FRANKFURT: OB51) is pleased to announce assay results from 29 drill holes completed at the M-67 deposit at the west end of the Central Zone in the Pine Point Mining Camp ('PPMC').

Drill hole M67-18-PP-027intersected 7.96% Zinc and 2.53% Lead over 22.84 metres and hole M67-18-PP-015 intersected 9.48% Zinc and 2.67% Lead over 17.00 metres. Other high-grade intersections include holes M67-18-PP-004 that inter...